In world, there are lot of structures built with good stability and strength.However,the different concrete structures have different removal time of formwork. 

In this article, we have discussed the formwork removal time of the most common concrete structures used in the field of civil construction.


Formwork removal time of different concrete structures

Formwork removal time of most common concrete structures is given in the  table below:-



OPC(Ordinary Portland Cement) is the most common type of cement used for concrete structures.This formwork removal given in the above table is only for Ordinary Portland cement. 

Formwork removal time for other types of cement can be different due to their existing specific properties.

What is the best temperature to pour concrete?

The suitable temperature for pouring of concrete varies between 38° to 58°F. Temperature that is less than 38° can reduce the strength of concrete. 

Temperature greater than 58° can lead to weakness,less durability, shrinkage, and cracking.